66605 Coimbatore–Shoranur Passenger train timings
Coimbatore Jn (CBE) → Shoranur Junction (SRR) · departs 9:45 AM, arrives 12:30 PM · 14 stops · 98 km · 2 h 45 min.
Where is Coimbatore–Shoranur Passenger right now?
Checking…
66605 Coimbatore–Shoranur Passenger schedule, station by station
Arrival, departure, halt, day of journey and distance from the origin at every scheduled stop, as a route line.
- —arr9:45 AMdepCoimbatore Jn CBEDay 10 kmStarts here
- 9:54 AMarr9:55 AMdepPodanur Jn PTJDay 16 kmhalt 1 min
- 10:05 AMarr10:06 AMdepMadukarai MDKIDay 116 kmhalt 1 min
- 10:14 AMarr10:15 AMdepEttimadai ETMDDay 121 kmhalt 1 min
- 10:27 AMarr10:28 AMdepWalayar WRADay 130 kmhalt 1 min
- 10:41 AMarr10:42 AMdepKanjikode KJKDDay 141 kmhalt 1 min
- 11:00 AMarr11:05 AMdepPalakkad Jn PGTDay 154 kmhalt 5 min
- 11:14 AMarr11:15 AMdepParli PLLDay 163 kmhalt 1 min
- 11:21 AMarr11:22 AMdepMankarai MNYDay 170 kmhalt 1 min
- 11:31 AMarr11:32 AMdepLakkiti LDYDay 178 kmhalt 1 min
- 11:36 AMarr11:37 AMdepPalappuram H PLPMDay 182 kmhalt 1 min
- 11:41 AMarr11:42 AMdepOttappalam OTPDay 185 kmhalt 1 min
- 11:51 AMarr11:52 AMdepMannanur MNURDay 192 kmhalt 1 min
- 12:30 PMarr—depDay 198 kmEnds here
Times are the scheduled timetable; halts under a minute show as 0. Coimbatore Jn → Shoranur Junction.
The Ministry of Railways open dataset does not include days of the week, so we do not guess them. Check “Train Schedule” on NTES for the running days of 66605.
Live position and delay are published only by Indian Railways: open NTES → Spot your train and enter 66605. Scheduled timings here; live status there.
Trains from Shoranur Junction to Coimbatore Jn
- 56604Shoranur–Coimbatore PassengerShoranur Junction → Coimbatore JnPassenger8:00 AM → 10:50 AM · 2 h 50 min · 98 km
- 66604Shoranur Coimbatore PassengerShoranur Junction → Coimbatore JnPassenger2:55 PM → 5:40 PM · 2 h 45 min · 98 km
66605 Coimbatore–Shoranur Passenger: questions
What time does 66605 Coimbatore–Shoranur Passenger leave Coimbatore Jn?
66605 Coimbatore–Shoranur Passenger departs Coimbatore Jn (CBE) at 9:45 AM as per the timetable. Check NTES for the live departure time on the day.
What time does 66605 reach Shoranur Junction?
Scheduled arrival at Shoranur Junction (SRR) is 12:30 PM, about 2 h 45 min after departure.
How many stops does Coimbatore–Shoranur Passenger have and how far does it run?
14 scheduled stops over 98 km from Coimbatore Jn to Shoranur Junction. The longest halts are Palakkad Jn (5 min), Podanur Jn (1 min), Madukarai (1 min).
Where is 66605 right now? Is it on time?
The Live status card on this page shows where Coimbatore–Shoranur Passenger is: LIVE when passengers on board are sharing their position (with the delay against the timetable: on time, late or early), otherwise the PREDICTED position from the schedule, assuming on-time running. Indian Railways' official running status is on NTES (enquiry.indianrail.gov.in).
All trains at Coimbatore Jn and Shoranur Junction · search another train · KSRTC bus timings.
Source and date. Timings are from the Ministry of Railways open dataset Indian Railways Train Time Table on data.gov.in (timetable as on 2017-11-01, published 2018-01-24; Government Open Data License – India). Indian Railways revises timetables, so train numbers, timings and halts can have changed since.
Before you travel check the live running status and the current schedule on NTES (enquiry.indianrail.gov.in) or indianrail.gov.in. Ask Bengaluru is an independent directory and does not sell tickets.