1705 Bandra–Jabalpur Superfast train timings
Bandra Terminus (BDTS) → Jabalpur (JBP) · departs 12:15 AM, arrives 9:40 PM · 14 stops · 1261 km · 21 h 25 min.
Where is Bandra–Jabalpur Superfast right now?
Checking…
1705 Bandra–Jabalpur Superfast schedule, station by station
Arrival, departure, halt, day of journey and distance from the origin at every scheduled stop, as a route line.
- —arr12:15 AMdepBandra Terminus BDTSDay 10 kmStarts here
- 12:45 AMarr12:48 AMdepBorivli BVIDay 118 kmhalt 3 min
- 2:40 AMarr2:42 AMdepVapi VAPIDay 1158 kmhalt 2 min
- 4:25 AMarr4:28 AMdepSurat STDay 1251 kmhalt 3 min
- 6:10 AMarr6:20 AMdepDay 1380 kmhalt 10 min
- 10:00 AMarr10:10 AMdepRatlam Jn RTMDay 1642 kmhalt 10 min
- 11:50 AMarr12:00 PMdepUjjain Jn UJNDay 1741 kmhalt 10 min
- 2:50 PMarr2:52 PMdepBairagarh BIHDay 1914 kmhalt 2 min
- 3:15 PMarr3:20 PMdepBhopal BPLDay 1925 kmhalt 5 min
- 4:30 PMarr4:32 PMdepHoshangabad HBDDay 1998 kmhalt 2 min
- 4:50 PMarr5:05 PMdepItarsi ETDay 11016 kmhalt 15 min
- 5:48 PMarr5:50 PMdepPipariya PPIDay 11084 kmhalt 2 min
- 7:28 PMarr7:30 PMdepNarsinghpur NUDay 11177 kmhalt 2 min
- 9:40 PMarr—depJabalpur JBPDay 11261 kmEnds here
Times are the scheduled timetable; halts under a minute show as 0. Bandra Terminus → Jabalpur.
The Ministry of Railways open dataset does not include days of the week, so we do not guess them. Check “Train Schedule” on NTES for the running days of 1705.
Live position and delay are published only by Indian Railways: open NTES → Spot your train and enter 1705. Scheduled timings here; live status there.
Trains from Jabalpur to Bandra Terminus
- 1706Jabalpur–Bandra SuperfastJabalpur → Bandra TerminusSuperfast2:20 PM → 11:15 AM · 20 h 55 min · 1262 km
1705 Bandra–Jabalpur Superfast: questions
What time does 1705 Bandra–Jabalpur Superfast leave Bandra Terminus?
1705 Bandra–Jabalpur Superfast departs Bandra Terminus (BDTS) at 12:15 AM as per the timetable. Check NTES for the live departure time on the day.
What time does 1705 reach Jabalpur?
Scheduled arrival at Jabalpur (JBP) is 9:40 PM, about 21 h 25 min after departure.
How many stops does Bandra–Jabalpur Superfast have and how far does it run?
14 scheduled stops over 1261 km from Bandra Terminus to Jabalpur. The longest halts are Itarsi (15 min), Vadodara Junction (10 min), Ratlam Jn (10 min).
Where is 1705 right now? Is it on time?
The Live status card on this page shows where Bandra–Jabalpur Superfast is: LIVE when passengers on board are sharing their position (with the delay against the timetable: on time, late or early), otherwise the PREDICTED position from the schedule, assuming on-time running. Indian Railways' official running status is on NTES (enquiry.indianrail.gov.in).
All trains at Bandra Terminus and Jabalpur · search another train · KSRTC bus timings.
Source and date. Timings are from the Ministry of Railways open dataset Indian Railways Train Time Table on data.gov.in (timetable as on 2017-11-01, published 2018-01-24; Government Open Data License – India). Indian Railways revises timetables, so train numbers, timings and halts can have changed since.
Before you travel check the live running status and the current schedule on NTES (enquiry.indianrail.gov.in) or indianrail.gov.in. Ask Bengaluru is an independent directory and does not sell tickets.