Skip to content
AskBengaluru
Green LineDirect

South End Circle to KR Market metro

Travelling from South End Circle to KR Market on Namma Metro takes 3 stops and about 9 minutes on the Green Line with no change. Board at platform 1, train towards Madavara. Token fare ₹20, smart card about ₹18.

Travel time
9 min
3 km
Stops
3
direct
Token fare
₹20
₹18 smart card
Board at
P1
towards Madavara
  1. Green Line3 stops · ~7 min

    Board at South End Circle on platform 1, train towards Madavara.

    Stations on this leg
    1. South End Circle›
    2. Lalbagh›
    3. National College›
    4. KR Market

    Get off at KR Market.

Timings on this route

  • Green Line
    First
    05:00
    Last
    23:05
    Peak
    8 min

First/last times are terminal departures (Tue–Sat). Mondays start earlier, Sundays at 07:00.

Travel time assumes about 2.4 minutes per stop plus interchange walking time; fares follow BMRCL distance slabs and may differ by one slab on a few pairs. Verify in the Namma Metro app before travel.
Change stations

Plan a different journey

Frequently asked questions

How long does the metro take from South End Circle to KR Market?

About 9 minutes for 3 stops. Allow extra time for peak-hour crowding.

What is the metro fare from South End Circle to KR Market?

₹20 by token or QR ticket and about ₹18 with a Namma Metro smart card (10% discount; a little more off-peak and on Sundays). The journey is roughly 3 km.

Which platform at South End Circle for KR Market?

Board at platform 1 on the Green Line, train towards Madavara.

Do I need to change trains between South End Circle and KR Market?

No. It is a direct Green Line journey.

What is the first and last metro from South End Circle?

Green Line trains start from the terminals at 05:00 Tuesday–Saturday (04:15 Monday, 07:00 Sunday) and the last terminal departure is 23:05. Add the travel time from the terminal to South End Circle.