Skip to content
AskBengaluru
Green LineDirect

RV Road to Srirampura metro

Travelling from RV Road to Srirampura on Namma Metro takes 9 stops and about 24 minutes on the Green Line with no change. Board at platform 1, train towards Madavara. Token fare ₹50, smart card about ₹45.

Travel time
24 min
9.4 km
Stops
9
direct
Token fare
₹50
₹45 smart card
Board at
P1
towards Madavara
  1. Green Line9 stops · ~22 min

    Board at RV Road on platform 1, train towards Madavara.

    Stations on this leg
    1. RV Road›
    2. Jayanagara›
    3. South End Circle›
    4. Lalbagh›
    5. National College›
    6. KR Market›
    7. Chickpete›
    8. Majestic›
    9. Sampige Road›
    10. Srirampura

    Get off at Srirampura.

Timings on this route

  • Green Line
    First
    05:00
    Last
    23:05
    Peak
    8 min

First/last times are terminal departures (Tue–Sat). Mondays start earlier, Sundays at 07:00.

Travel time assumes about 2.4 minutes per stop plus interchange walking time; fares follow BMRCL distance slabs and may differ by one slab on a few pairs. Verify in the Namma Metro app before travel.
Change stations

Plan a different journey

Frequently asked questions

How long does the metro take from RV Road to Srirampura?

About 24 minutes for 9 stops. Allow extra time for peak-hour crowding.

What is the metro fare from RV Road to Srirampura?

₹50 by token or QR ticket and about ₹45 with a Namma Metro smart card (10% discount; a little more off-peak and on Sundays). The journey is roughly 9.4 km.

Which platform at RV Road for Srirampura?

Board at platform 1 on the Green Line, train towards Madavara.

Do I need to change trains between RV Road and Srirampura?

No. It is a direct Green Line journey.

What is the first and last metro from RV Road?

Green Line trains start from the terminals at 05:00 Tuesday–Saturday (04:15 Monday, 07:00 Sunday) and the last terminal departure is 23:05. Add the travel time from the terminal to RV Road.