Peenya Industry to JP Nagar metro
Travelling from Peenya Industry to JP Nagar on Namma Metro takes 19 stops and about 48 minutes on the Green Line with no change. Board at platform 2, train towards Silk Institute. Token fare ₹70, smart card about ₹63.
- Green Line19 stops · ~46 min
Board at Peenya Industry on platform 2, train towards Silk Institute.
Stations on this leg
Get off at JP Nagar.
Timings on this route
- Green Line
- First
- 05:00
- Last
- 23:05
- Peak
- 8 min
First/last times are terminal departures (Tue–Sat). Mondays start earlier, Sundays at 07:00.
Plan a different journey
Frequently asked questions
How long does the metro take from Peenya Industry to JP Nagar?
About 48 minutes for 19 stops. Allow extra time for peak-hour crowding.
What is the metro fare from Peenya Industry to JP Nagar?
₹70 by token or QR ticket and about ₹63 with a Namma Metro smart card (10% discount; a little more off-peak and on Sundays). The journey is roughly 18.9 km.
Which platform at Peenya Industry for JP Nagar?
Board at platform 2 on the Green Line, train towards Silk Institute.
Do I need to change trains between Peenya Industry and JP Nagar?
No. It is a direct Green Line journey.
What is the first and last metro from Peenya Industry?
Green Line trains start from the terminals at 05:00 Tuesday–Saturday (04:15 Monday, 07:00 Sunday) and the last terminal departure is 23:05. Add the travel time from the terminal to Peenya Industry.