Skip to content
AskBengaluru
Green LineYellow Line1 change

Jayanagara to Kudlu Gate metro

Travelling from Jayanagara to Kudlu Gate on Namma Metro takes 8 stops and about 24 minutes with a change at RV Road. Board at platform 2, train towards Silk Institute. Token fare ₹50, smart card about ₹45.

Travel time
24 min
9.3 km
Stops
8
1 interchange
Token fare
₹50
₹45 smart card
Board at
P2
towards Silk Institute
  1. Green Line1 stop · ~2 min

    Board at Jayanagara on platform 2, train towards Silk Institute.

    Stations on this leg
    1. Jayanagara›
    2. RV Road

    Get off at RV Road to change lines.

  2. ChangeAlight at RV Road and walk to platform 3 for the Yellow Line (about 3 min).
    Yellow Line7 stops · ~17 min

    Board at RV Road on platform 3, train towards Bommasandra.

    Stations on this leg
    1. RV Road›
    2. Ragigudda›
    3. Jayadeva Hospital›
    4. BTM Layout›
    5. Central Silk Board›
    6. Bommanahalli›
    7. Hongasandra›
    8. Kudlu Gate

    Get off at Kudlu Gate.

Timings on this route

  • Green Line
    First
    05:00
    Last
    23:05
    Peak
    8 min
  • Yellow Line
    First
    06:00
    Last
    23:55
    Peak
    9–10 min

First/last times are terminal departures (Tue–Sat). Mondays start earlier, Sundays at 07:00.

Travel time assumes about 2.4 minutes per stop plus interchange walking time; fares follow BMRCL distance slabs and may differ by one slab on a few pairs. Verify in the Namma Metro app before travel.
Change stations

Plan a different journey

Frequently asked questions

How long does the metro take from Jayanagara to Kudlu Gate?

About 24 minutes for 8 stops, including 3 minutes to change at RV Road. Allow extra time for peak-hour crowding.

What is the metro fare from Jayanagara to Kudlu Gate?

₹50 by token or QR ticket and about ₹45 with a Namma Metro smart card (10% discount; a little more off-peak and on Sundays). The journey is roughly 9.3 km.

Which platform at Jayanagara for Kudlu Gate?

Board at platform 2 on the Green Line, train towards Silk Institute. At RV Road change to platform 3 for the Yellow Line towards Bommasandra.

Do I need to change trains between Jayanagara and Kudlu Gate?

Yes, once: at RV Road from the Green Line to the Yellow Line.

What is the first and last metro from Jayanagara?

Green Line trains start from the terminals at 05:00 Tuesday–Saturday (04:15 Monday, 07:00 Sunday) and the last terminal departure is 23:05. The connecting Yellow Line runs until 23:55. Add the travel time from the terminal to Jayanagara.