Skip to content
AskBengaluru
Green Line

Namma Metro Green Line: Madavara to Silk Institute

The Green Line has 32 stations over about 33.5 km, opened March 2014 – November 2024. Trains run every 8 min (07:00–10:00, 17:00–21:00) and every 10–15 min off-peak. End to end takes about 76 minutes and costs ₹90 by token.

Stations
32
33.5 km
First train
05:00
Mon 04:15 · Sun 07:00
Last train
23:05
from terminals
End to end
76 min
₹90 token
Route search

Plan a journey from any Green Line station

Use the planner above, or open a station page for its first and last trains, platforms and nearby bus stands.

Frequently asked questions

What are the Green Line metro timings?

The first Green Line train leaves the terminals at 05:00 from Tuesday to Saturday, 04:15 on Mondays and 07:00 on Sundays and public holidays. The last train departs the terminals at 23:05.

How many stations are on the Green Line?

32 stations from Madavara to Silk Institute, covering about 33.5 km. End to end takes roughly 76 minutes.

How frequent are Green Line trains?

every 8 min (07:00–10:00, 17:00–21:00) and every 10–15 min off-peak.

Where does the Green Line connect with other lines?

Majestic (Purple Line & Green Line), RV Road (Green Line & Yellow Line).

What is the maximum Green Line fare?

Token fare from Madavara to Silk Institute is ₹90 (₹81 with a smart card). Shorter hops start at ₹10.