BMTC CLO-NTR bus timings: CS-Chandra Layout to Nrupathunganagara Chandana Hospital
Route CLO-NTR runs CS-Chandra Layout to Nrupathunganagara Chandana Hospital with 7 stops, 1 trips a day, 9 minutes end to end.
Every stop on the CLO-NTR, both directions.
Tap a stop for all the buses that call there. The journey time is spread over the stops from the route's end-to-end running time.
CS-Chandra Layout → Nrupathunganagara Chandana Hospital
1 trips · first 8:16 AM · last 8:16 AM- +0mCS-Chandra Layoutಚಂದ್ರಾ ಬಡಾವಣೆ (ಟುವರ್ಡ್ಸ್ ಲಾಸ್ಟ್ ಬಸ್ ಸ್ಟಾಪ್)
- +2mJyothi Nagaraಜ್ಯೋತಿ ನಗರ (ಟುವರ್ಡ್ಸ್ ನಾಗರಭಾವಿ ವೃತ್ತ)
- +3mCS-Nagarabhavi Circleನಾಗರಭಾವಿ ವೃತ್ತ (ಟುವರ್ಡ್ಸ್ ವಿಜಯನಗರ)
- +5mManasa Nagaraಮಾನಸ ನಗರ (ಟುವರ್ಡ್ಸ್ ನಾಗರಭಾವಿ ವೃತ್ತ)
- +6m12th Block Nagarabhavi12ನೇ ಬ್ಲಾಕ್ ನಾಗರಭಾವಿ (ಟುವರ್ಡ್ಸ್ ಎಐಟಿ ಕಾಲೇಜ್)
- +8mNGEF Layout Nagarabhaviಎನ್ ಜಿ ಇ ಎಫ್ ಬಡಾವಣೆ ನಾಗರಭಾವಿ (ಟುವರ್ಡ್ಸ್ ಎಐಟಿ ಕಾಲೇಜು)
- +9mNrupathunganagara Chandana Hospitalನೃಪತುಂಗನಗರ ಚಂದನ ಆಸ್ಪತ್ರೆ (ಟುವರ್ಡ್ಸ್ ನಾಗರಭಾವಿ ಗ್ರಾಮ)
/data/bmtc-gtfs.json and /data/bmtc-fares.json are available under the same licence. Times are the scheduled timetable; buses run to traffic, so check the Namma BMTC app for live positions. Only routes with live tracking in that app appear here.Another bus? Search From → To or by number.
Loading BMTC routes…
BMTC CLO-NTR: questions
What is the first and last BMTC CLO-NTR bus?
From CS-Chandra Layout, the first CLO-NTR leaves at 8:16 AM and the last at 8:16 AM.
How often does BMTC CLO-NTR run and how long does it take?
1 trips a day across the route; the full run takes about 9 minutes. Frequency drops late at night and on Sundays.
Which stops does the CLO-NTR serve?
7 stops from CS-Chandra Layout to Nrupathunganagara Chandana Hospital: CS-Chandra Layout, Jyothi Nagara, CS-Nagarabhavi Circle, Manasa Nagara, 12th Block Nagarabhavi, NGEF Layout Nagarabhavi, Nrupathunganagara Chandana Hospital.
What is the BMTC CLO-NTR fare?
Stage fares apply; ask the conductor or check the Namma BMTC app.
Heading out of the city? KSRTC departures from Kempegowda Bus Station · Namma Metro.