BMTC BEML5-KSLOW bus timings: Kumaraswamy Layout West to BEML Layout 5th Stage
Route BEML5-KSLOW runs Kumaraswamy Layout West to BEML Layout 5th Stage with 16 stops, 1 trips a day, 34 minutes end to end.
Every stop on the BEML5-KSLOW, both directions.
Tap a stop for all the buses that call there. The journey time is spread over the stops from the route's end-to-end running time.
Kumaraswamy Layout West → BEML Layout 5th Stage
1 trips · first 11:05 AM · last 11:05 AM- +0mKumaraswamy Layout Westಕುಮಾರಸ್ವಾಮಿ ಬಡಾವಣೆ ಪಶ್ಚಿಮ (ಟುವರ್ಡ್ಸ್ ಕುಮಾರಸ್ವಾಮಿ ಬಡಾವಣೆ ಪಶ್ಚಿಮ)
- +2mKumaraswamy Layout 2nd Stageಕುಮಾರಸ್ವಾಮಿ ಬಡಾವಣೆ 2ನೇ ಹಂತ (ಟುವರ್ಡ್ಸ್ ಕೊನೆಯ ನಿಲ್ದಾಣ)
- +5mISRO Layoutಇಸ್ರೋ ಬಡಾವಣೆ (ಟುವರ್ಡ್ಸ್ ಪೈಪ್ ಲೈನ್)
- +7mBikashipuraಬಿಕಾಶಿಪುರ (ಟುವರ್ಡ್ಸ್ ಇಸ್ರೋ ಲೇಔಟ್)
- +9mPipeline ISRO Layoutಪೈಪ್ ಲೈನ್ ಇಸ್ರೋ ಲೇಔಟ್ (ಟುವರ್ಡ್ಸ್ ಕೋಣನಕುಂಟೆ ಕ್ರಾಸ್)
- +11mVasanthapuraವಸಂತಪುರ (ಟುವರ್ಡ್ಸ್ ಕೋಣನಕುಂಟೆ ಕ್ರಾಸ್)
- +14mYadalam Nagaraಯದಲಂ ನಗರ (ಟುವರ್ಡ್ಸ್ ವಸಂತಪುರ)
- +16mSubramanyapura KEBಸುಬ್ರಮಣ್ಯಪುರ ಕೆಇಬಿ (ಟುವರ್ಡ್ಸ್ ವಸಂತಪುರ)
- +18mSubramanyapura Post Officeಸುಬ್ರಮಣ್ಯಪುರ ಅಂಚೆ ಕಚೇರಿ (ಟುವರ್ಡ್ಸ್ ವಸಂತಪುರ)
- +20mUttarahalliಉತ್ತರಹಳ್ಳಿ (ಟುವರ್ಡ್ಸ್ ಬನಶಂಕರಿ)
- +23mArehalliಅರೆಹಳ್ಳಿ (ಟುವರ್ಡ್ಸ್ ಕೆಂಗೇರಿ)
- +25mPoornaprajna Layoutಪೂರ್ಣಪ್ರಜ್ಞಾ ಬಡಾವಣೆ (ಟುವರ್ಡ್ಸ್ ಉತ್ತರಹಳ್ಳಿ)
- +27mPoornaprajna Layout Water Tankಪೂರ್ಣಪ್ರಜ್ಞ ಬಡಾವಣೆ ವಾಟರ್ ಟ್ಯಾಂಕ್ (ಟುವರ್ಡ್ಸ್ ಉತ್ತರಹಳ್ಳಿ)
- +29mPatalamma Templeಪಟಾಲಮ್ಮ ದೇವಸ್ಥಾನ (ಟುವರ್ಡ್ಸ್ ಉತ್ತರಹಳ್ಳಿ)
- +32mCS-Channasandra Uttarahalliಚನ್ನಸಂದ್ರ (ಟುವರ್ಡ್ಸ್ N/A)
- +34mBEML Layout 5th Stageಬಿಇಎಂಎಲ್ ಬಡಾವಣೆ 5ನೇ ಹಂತ (ಟುವರ್ಡ್ಸ್ ಚನ್ನಸಂದ್ರ)
/data/bmtc-gtfs.json and /data/bmtc-fares.json are available under the same licence. Times are the scheduled timetable; buses run to traffic, so check the Namma BMTC app for live positions. Only routes with live tracking in that app appear here.Another bus? Search From → To or by number.
Loading BMTC routes…
BMTC BEML5-KSLOW: questions
What is the first and last BMTC BEML5-KSLOW bus?
From Kumaraswamy Layout West, the first BEML5-KSLOW leaves at 11:05 AM and the last at 11:05 AM.
How often does BMTC BEML5-KSLOW run and how long does it take?
1 trips a day across the route; the full run takes about 34 minutes. Frequency drops late at night and on Sundays.
Which stops does the BEML5-KSLOW serve?
16 stops from Kumaraswamy Layout West to BEML Layout 5th Stage: Kumaraswamy Layout West, Kumaraswamy Layout 2nd Stage, ISRO Layout, Bikashipura, Pipeline ISRO Layout, Vasanthapura, Yadalam Nagara, Subramanyapura KEB, Subramanyapura Post Office, Uttarahalli and more (full list above).
What is the BMTC BEML5-KSLOW fare?
Stage fares apply; ask the conductor or check the Namma BMTC app.
Heading out of the city? KSRTC departures from Kempegowda Bus Station · Namma Metro.