Skip to content
AskBengaluru
BEML A-7BMTC city bus

BMTC BEML A-7 bus timings: CS-Yelahanka 5th Phase to BEML Factory

Route BEML A-7 runs CS-Yelahanka 5th Phase to BEML Factory with 2 stops (and 2 back), 2 trips a day, 60 minutes end to end.

First bus
5:45 AM
from CS-Yelahanka 5th Phase
Last bus
5:45 AM
from CS-Yelahanka 5th Phase
Frequency
—
2 trips a day
Fare
stage fare
BMTC
Stops

Every stop on the BEML A-7, both directions.

Tap a stop for all the buses that call there. The journey time is spread over the stops from the route's end-to-end running time.

CS-Yelahanka 5th Phase → BEML Factory

1 trips · first 5:45 AM · last 5:45 AM
  1. +0m
    CS-Yelahanka 5th Phaseಸರ್ಕಾರಿ ಶಾಲೆ ಯಲಹಂಕ 4ನೇ ಹಂತ (ಟುವರ್ಡ್ಸ್ ಮದರ್‌ ಡೈರಿ)
  2. +60m
    BEML Factoryಬಿಇಎಂಎಲ್ ಫ್ಯಾಕ್ಟರಿ (ಟುವರ್ಡ್ಸ್ ತಿಪ್ಪಸಂದ್ರ)

BEML Factory → CS-Yelahanka 5th Phase

1 trips · first 3:15 PM · last 3:15 PM
  1. +0m
    BEML Factoryಬಿಇಎಂಎಲ್ ಫ್ಯಾಕ್ಟರಿ (ಟುವರ್ಡ್ಸ್ ತಿಪ್ಪಸಂದ್ರ)
  2. +80m
    CS-Yelahanka 5th Phaseಸರ್ಕಾರಿ ಶಾಲೆ ಯಲಹಂಕ 4ನೇ ಹಂತ (ಟುವರ್ಡ್ಸ್ ಮದರ್‌ ಡೈರಿ)
Source and date. BMTC routes, stops, timetables and fares come from the open bmtc-gtfs dataset (built from the official Namma BMTC app; feed 07-09-2026, imported 2026-10-22), licensed under the Open Database License (ODbL). Our derived files /data/bmtc-gtfs.json and /data/bmtc-fares.json are available under the same licence. Times are the scheduled timetable; buses run to traffic, so check the Namma BMTC app for live positions. Only routes with live tracking in that app appear here.
Finder

Another bus? Search From → To or by number.

Loading BMTC routes…

BMTC BEML A-7: questions

What is the first and last BMTC BEML A-7 bus?

From CS-Yelahanka 5th Phase, the first BEML A-7 leaves at 5:45 AM and the last at 5:45 AM. From BEML Factory, the first is 3:15 PM and the last 3:15 PM.

How often does BMTC BEML A-7 run and how long does it take?

2 trips a day across both directions; the full run takes about 60 minutes. Frequency drops late at night and on Sundays.

Which stops does the BEML A-7 serve?

2 stops from CS-Yelahanka 5th Phase to BEML Factory: CS-Yelahanka 5th Phase, BEML Factory.

What is the BMTC BEML A-7 fare?

Stage fares apply; ask the conductor or check the Namma BMTC app.

Heading out of the city? KSRTC departures from Kempegowda Bus Station · Namma Metro.

Ratings & reviews

ನಮ್ಮ ವೆಬ್‌ಸೈಟ್ ಬಗ್ಗೆ ನಿಮ್ಮ ಅಭಿಪ್ರಾಯ ಮತ್ತು ಸಲಹೆಗಳನ್ನು ತಿಳಿಸಿ.

How useful was this page? Your rating and comment help other travellers and tell us what to fix.

–
★★★★★
Loading…
    Rate this page · ಈ ಪುಟವನ್ನು ರೇಟ್ ಮಾಡಿ

    Your first name and comment are shown publicly with your rating. Reviews are moderated; no sign-up needed.

    ಸೂಚನೆ: ಇಲ್ಲಿ ನೀಡಿರುವ ಬಸ್ ಸಮಯಗಳು ಮತ್ತು ವಿವರಗಳು ಸಾಮಾನ್ಯ ಮಾಹಿತಿಗಾಗಿ ಮಾತ್ರ. ಇವು ಸಂಪೂರ್ಣವಾಗಿ ನಿಖರವಾಗಿರದೇ ಇರಬಹುದು. ಟ್ರಾಫಿಕ್, ಹವಾಮಾನ ಪರಿಸ್ಥಿತಿ ಅಥವಾ ಕಾರ್ಯಾಚರಣಾ ನಿರ್ಧಾರಗಳ ಕಾರಣದಿಂದ ಬಸ್ ಸಮಯಗಳಲ್ಲಿ ಬದಲಾವಣೆ ಸಂಭವಿಸಬಹುದು.

    Ask Bengaluru ಒಂದು ಸ್ವತಂತ್ರ ವೇದಿಕೆಯಾಗಿದ್ದು, ಯಾವುದೇ ಸಾರಿಗೆ ಸಂಸ್ಥೆಯೊಂದಿಗೆ ಅಧಿಕೃತ ಸಹಭಾಗಿತ್ವ ಅಥವಾ ಒಪ್ಪಂದ ಹೊಂದಿಲ್ಲ. ನಿಮ್ಮ ಪ್ರಯಾಣವನ್ನು ಯೋಜಿಸುವ ಮೊದಲು ಅಧಿಕೃತ ಮೂಲಗಳಿಂದ ಬಸ್ ಸಮಯ ಮತ್ತು ವಿವರಗಳನ್ನು ಖಚಿತಪಡಿಸಿಕೊಳ್ಳಿ.

    Note: The bus timings and details provided here are for general reference and may not be entirely accurate. Timings are subject to change due to traffic, weather, or operational decisions. Ask Bengaluru is an independent platform and has no official tie-ups with any transport operators. Please confirm with official authorities before planning your journey.