Skip to content
AskBengaluru
Green LineYellow Line1 change

Silk Institute to Beratena Agrahara metro

Travelling from Silk Institute to Beratena Agrahara on Namma Metro takes 18 stops and about 48 minutes with a change at RV Road. Board at platform 1, train towards Madavara. Token fare ₹80, smart card about ₹72.

Travel time
48 min
21.3 km
Stops
18
1 interchange
Token fare
₹80
₹72 smart card
Board at
P1
towards Madavara
  1. Green Line8 stops · ~19 min

    Board at Silk Institute on platform 1, train towards Madavara.

    Stations on this leg
    1. Silk Institute›
    2. Thalaghattapura›
    3. Vajarahalli›
    4. Doddakallasandra›
    5. Konanakunte Cross›
    6. Yelachenahalli›
    7. JP Nagar›
    8. Banashankari›
    9. RV Road

    Get off at RV Road to change lines.

  2. ChangeAlight at RV Road and walk to platform 3 for the Yellow Line (about 3 min).
    Yellow Line10 stops · ~24 min

    Board at RV Road on platform 3, train towards Bommasandra.

    Stations on this leg
    1. RV Road›
    2. Ragigudda›
    3. Jayadeva Hospital›
    4. BTM Layout›
    5. Central Silk Board›
    6. Bommanahalli›
    7. Hongasandra›
    8. Kudlu Gate›
    9. Singasandra›
    10. Hosa Road›
    11. Beratena Agrahara

    Get off at Beratena Agrahara.

Timings on this route

  • Green Line
    First
    05:00
    Last
    23:05
    Peak
    8 min
  • Yellow Line
    First
    06:00
    Last
    23:55
    Peak
    9–10 min

First/last times are terminal departures (Tue–Sat). Mondays start earlier, Sundays at 07:00.

Travel time assumes about 2.4 minutes per stop plus interchange walking time; fares follow BMRCL distance slabs and may differ by one slab on a few pairs. Verify in the Namma Metro app before travel.
Change stations

Plan a different journey

Frequently asked questions

How long does the metro take from Silk Institute to Beratena Agrahara?

About 48 minutes for 18 stops, including 3 minutes to change at RV Road. Allow extra time for peak-hour crowding.

What is the metro fare from Silk Institute to Beratena Agrahara?

₹80 by token or QR ticket and about ₹72 with a Namma Metro smart card (10% discount; a little more off-peak and on Sundays). The journey is roughly 21.3 km.

Which platform at Silk Institute for Beratena Agrahara?

Board at platform 1 on the Green Line, train towards Madavara. At RV Road change to platform 3 for the Yellow Line towards Bommasandra.

Do I need to change trains between Silk Institute and Beratena Agrahara?

Yes, once: at RV Road from the Green Line to the Yellow Line.

What is the first and last metro from Silk Institute?

Green Line trains start from the terminals at 05:00 Tuesday–Saturday (04:15 Monday, 07:00 Sunday) and the last terminal departure is 23:05. The connecting Yellow Line runs until 23:55. Add the travel time from the terminal to Silk Institute.