Skip to content
AskBengaluru
Yellow LineGreen Line1 change

Infosys Agrahara to JP Nagar metro

Travelling from Infosys Agrahara to JP Nagar on Namma Metro takes 14 stops and about 39 minutes with a change at RV Road. Board at platform 1, train towards RV Road. Token fare ₹70, smart card about ₹63.

Travel time
39 min
16.4 km
Stops
14
1 interchange
Token fare
₹70
₹63 smart card
Board at
P1
towards RV Road
  1. Yellow Line12 stops · ~29 min

    Board at Infosys Agrahara on platform 1, train towards RV Road.

    Stations on this leg
    1. Infosys Agrahara›
    2. Electronic City›
    3. Beratena Agrahara›
    4. Hosa Road›
    5. Singasandra›
    6. Kudlu Gate›
    7. Hongasandra›
    8. Bommanahalli›
    9. Central Silk Board›
    10. BTM Layout›
    11. Jayadeva Hospital›
    12. Ragigudda›
    13. RV Road

    Get off at RV Road to change lines.

  2. ChangeAlight at RV Road and walk to platform 2 for the Green Line (about 3 min).
    Green Line2 stops · ~5 min

    Board at RV Road on platform 2, train towards Silk Institute.

    Stations on this leg
    1. RV Road›
    2. Banashankari›
    3. JP Nagar

    Get off at JP Nagar.

Timings on this route

  • Yellow Line
    First
    06:00
    Last
    23:55
    Peak
    9–10 min
  • Green Line
    First
    05:00
    Last
    23:05
    Peak
    8 min

First/last times are terminal departures (Tue–Sat). Mondays start earlier, Sundays at 07:00.

Travel time assumes about 2.4 minutes per stop plus interchange walking time; fares follow BMRCL distance slabs and may differ by one slab on a few pairs. Verify in the Namma Metro app before travel.
Change stations

Plan a different journey

Frequently asked questions

How long does the metro take from Infosys Agrahara to JP Nagar?

About 39 minutes for 14 stops, including 3 minutes to change at RV Road. Allow extra time for peak-hour crowding.

What is the metro fare from Infosys Agrahara to JP Nagar?

₹70 by token or QR ticket and about ₹63 with a Namma Metro smart card (10% discount; a little more off-peak and on Sundays). The journey is roughly 16.4 km.

Which platform at Infosys Agrahara for JP Nagar?

Board at platform 1 on the Yellow Line, train towards RV Road. At RV Road change to platform 2 for the Green Line towards Silk Institute.

Do I need to change trains between Infosys Agrahara and JP Nagar?

Yes, once: at RV Road from the Yellow Line to the Green Line.

What is the first and last metro from Infosys Agrahara?

Yellow Line trains start from the terminals at 06:00 Tuesday–Saturday (05:05 Monday, 07:00 Sunday) and the last terminal departure is 23:55. The connecting Green Line runs until 23:05. Add the travel time from the terminal to Infosys Agrahara.