Skip to content
AskBengaluru
Yellow LineGreen Line1 change

Hosa Road to Madavara metro

Travelling from Hosa Road to Madavara on Namma Metro takes 32 stops and about 82 minutes with a change at RV Road. Board at platform 1, train towards RV Road. Token fare ₹90, smart card about ₹81.

Travel time
82 min
34.4 km
Stops
32
1 interchange
Token fare
₹90
₹81 smart card
Board at
P1
towards RV Road
  1. Yellow Line9 stops · ~22 min

    Board at Hosa Road on platform 1, train towards RV Road.

    Stations on this leg
    1. Hosa Road›
    2. Singasandra›
    3. Kudlu Gate›
    4. Hongasandra›
    5. Bommanahalli›
    6. Central Silk Board›
    7. BTM Layout›
    8. Jayadeva Hospital›
    9. Ragigudda›
    10. RV Road

    Get off at RV Road to change lines.

  2. ChangeAlight at RV Road and walk to platform 1 for the Green Line (about 3 min).

Timings on this route

  • Yellow Line
    First
    06:00
    Last
    23:55
    Peak
    9–10 min
  • Green Line
    First
    05:00
    Last
    23:05
    Peak
    8 min

First/last times are terminal departures (Tue–Sat). Mondays start earlier, Sundays at 07:00.

Travel time assumes about 2.4 minutes per stop plus interchange walking time; fares follow BMRCL distance slabs and may differ by one slab on a few pairs. Verify in the Namma Metro app before travel.
Change stations

Plan a different journey

Frequently asked questions

How long does the metro take from Hosa Road to Madavara?

About 82 minutes for 32 stops, including 3 minutes to change at RV Road. Allow extra time for peak-hour crowding.

What is the metro fare from Hosa Road to Madavara?

₹90 by token or QR ticket and about ₹81 with a Namma Metro smart card (10% discount; a little more off-peak and on Sundays). The journey is roughly 34.4 km.

Which platform at Hosa Road for Madavara?

Board at platform 1 on the Yellow Line, train towards RV Road. At RV Road change to platform 1 for the Green Line towards Madavara.

Do I need to change trains between Hosa Road and Madavara?

Yes, once: at RV Road from the Yellow Line to the Green Line.

What is the first and last metro from Hosa Road?

Yellow Line trains start from the terminals at 06:00 Tuesday–Saturday (05:05 Monday, 07:00 Sunday) and the last terminal departure is 23:55. The connecting Green Line runs until 23:05. Add the travel time from the terminal to Hosa Road.